Home · Services · Home Extension · Rear Extensions

Rear extensions in London

The rear extension is the most frequent residential brief in London, and the decisions made at the outset shape everything that follows.

Portland House — rear extension with portland stone frame and full-height glazing
The brief

A rear extension reorganises the ground floor of a house around the garden. On a London terrace it typically replaces a narrow rear return with a single room for cooking, dining and living, drawing daylight into the centre of the plan.

Approach

The studio begins with the relationship between old and new: the proportion of the opening to the garden, the meeting of roof lines, the orientation of glazing and the way the new room is entered. These decisions are made in the first weeks of the project, and they determine whether the extension reads as part of the house or as an addition to it. Three options are tested before a direction is chosen.

Planning and regulation

Many single-storey rear extensions fall within permitted development; others, including most in conservation areas or under Article 4 directions, require a householder application. The planning position of each property is established at the outset, together with party wall obligations to neighbouring owners.

Delivery

The work proceeds through feasibility, concept design, planning, technical design and construction. A complete technical package reduces uncertainty at tender, and the studio administers the building contract through to practical completion.

Fees

Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.

Frequently asked questions

Is planning permission required for a rear extension? +
Often not. Many rear extensions fall under permitted development — up to 3m depth on an attached house, 4m on a detached one, single-storey, under 4m height. The studio checks the property's position (planning history, conservation status, Article 4 directions) as part of the initial consultation. The position is confirmed before any fee is committed.
How are fees and construction costs established? +
Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.
How long does a rear extension take from start to finish? +
Typically 3-5 months for design and planning consent, 4-8 weeks for the technical package, and 3-5 months on site. Total: 9-14 months from first meeting to moving back in. A written programme is issued at the outset.
Does a rear extension add value to a house? +
A poorly designed one can reduce value. The difference is in the design decisions made at concept stage, which is why three options are presented, with the trade-offs explained, before any commitment is made.
What is the difference between permitted development and planning permission? +
Permitted development is a set of pre-approved rights that let you build certain extensions without applying to the council. If the extension falls within the rules (size, height, position, materials), you do not need permission — you just build. We check which route applies to the property before any design work begins.

Who we work with

  1. 01Homeowners
  2. 02Families
  3. 03Landlords
  4. 04Self-builders
  5. 05Property developers
  6. 06Investors
  7. 07Businesses

Why clients choose us

01Fixed fees

Fees are fixed at each stage and confirmed in writing, so that cost is known before design begins.

02Director-led

A director leads each project from the first conversation to completion, giving continuity at every stage.

03Response

Every enquiry is answered by a director within one working day, and progress is reported at every stage.

04Independent advice

Advice follows the evidence, including where it departs from the initial brief.

05Design quality

Design is resolved in detail before it reaches site, so that the quality of the idea is carried into the built work.

Related services

Services that usually sit alongside this appointment. Fixed fees, staged, with a director leading the work.

Discuss a project with the studio

Provide the site address and a summary of the requirement. A director will respond within one working day.

Call Email the studio Request a proposal