Wall removal
Structural design for the removal of internal walls, load-bearing or otherwise, coordinated with Building Regulations and party wall requirements.
Structural design for the removal of internal walls, load-bearing or otherwise, coordinated with Building Regulations and party wall requirements.

The removal of an internal wall reorganises the plan of a house, and must be supported by structural design where the wall carries load.
The studio determines whether a wall is load-bearing, designs the replacement structure, and considers how the new opening changes light, movement and the use of the rooms around it.
Structural alterations require Building Regulations approval, and party wall procedures apply where the work affects a shared structure. Listed buildings require consent for internal alterations.
Structural calculations, drawings and approvals are prepared by the studio, with oversight of the works where required.
Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.
Fees are fixed at each stage and confirmed in writing, so that cost is known before design begins.
A director leads each project from the first conversation to completion, giving continuity at every stage.
Every enquiry is answered by a director within one working day, and progress is reported at every stage.
Advice follows the evidence, including where it departs from the initial brief.
Design is resolved in detail before it reaches site, so that the quality of the idea is carried into the built work.
Services that usually sit alongside this appointment. Fixed fees, staged, with a director leading the work.
Provide the site address and a summary of the requirement. A director will respond within one working day.