Home · Services · Renovation & Remodelling · Kitchen Renovation

Kitchen renovations

The ground floor reconsidered around a new kitchen, with structural change, layout and coordination resolved together.

Contemporary open-plan kitchen with island and pendant lighting
The brief

A kitchen renovation is often a reorganisation of the ground floor: the kitchen is the starting point, but the design concerns light, movement and the relationship between rooms.

Approach

Design begins with the room rather than the cabinetry: where light enters, where the view to the garden falls, how people move between the front door, the kitchen, the table and the garden, and how the household cooks and eats. Structural changes are planned alongside the layout.

Planning and regulation

Internal alterations rarely require planning permission, although listed buildings and flats may be subject to consent or lease restrictions. Structural alterations, drainage and ventilation require Building Regulations approval.

Delivery

The studio prepares the layout, structural coordination and specification, and oversees the works so that the design is delivered as intended.

Fees

Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.

Frequently asked questions

Is a designer required for a kitchen renovation? +
Not always. If you are replacing cabinets within the same layout, a kitchen designer is enough. You need a designer when walls are moving (structural design + Building Regs), the layout is fundamentally changing (services rerouting), or the kitchen is part of a larger project like an extension.
How are fees and construction costs established? +
Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.
Is planning permission required for a kitchen renovation? +
Almost never for internal works. If you are removing walls, you need Building Regulations approval (not planning permission). If the kitchen renovation is part of a rear extension, the extension may need planning — the kitchen itself does not.
How long does a kitchen renovation take? +
2-4 months for design and coordination, then 2-4 months on site. Longer if it involves structural changes or is part of a larger project. We sequence the work so you are without a kitchen for as short a time as possible.

Who we work with

  1. 01Homeowners
  2. 02Families
  3. 03Landlords
  4. 04Self-builders
  5. 05Property developers
  6. 06Investors
  7. 07Businesses

Why clients choose us

01Fixed fees

Fees are fixed at each stage and confirmed in writing, so that cost is known before design begins.

02Director-led

A director leads each project from the first conversation to completion, giving continuity at every stage.

03Response

Every enquiry is answered by a director within one working day, and progress is reported at every stage.

04Independent advice

Advice follows the evidence, including where it departs from the initial brief.

05Design quality

Design is resolved in detail before it reaches site, so that the quality of the idea is carried into the built work.

Related services

Services that usually sit alongside this appointment. Fixed fees, staged, with a director leading the work.

Discuss a project with the studio

Provide the site address and a summary of the requirement. A director will respond within one working day.

Call Email the studio Request a proposal