Infrastructure is usually hidden. Here the circular tanks are allowed to be the architecture. A visitor building sits on the shore so the works have a public face without disguising the process.
Plan and cycle are the same drawing. That is the skill we are practising: make a plant legible. An infrastructure study, not a commissioned works.
Study
A written, fixed-fee quote. No obligation.