Bathroom renovations
Bathrooms designed as rooms, with layout, drainage, structure and finishes coordinated as a single piece of work.
Bathrooms designed as rooms, with layout, drainage, structure and finishes coordinated as a single piece of work.

A bathroom is designed as a room, with layout, drainage, structure, ventilation and finishes resolved as a single piece of work.
The studio considers how the room is used, where daylight and privacy fall, and how services can be routed without compromising the structure of the house. Layout and specification are agreed before installation begins, so that the finished room reflects the design rather than on-site improvisation.
Bathroom work rarely requires planning permission, but new drainage, ventilation and electrical work fall under Building Regulations. In listed buildings, consent may be required for internal alterations.
Drawings, specification and coordination with the installer are prepared by the studio, with site oversight where required.
Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.
Fees are fixed at each stage and confirmed in writing, so that cost is known before design begins.
A director leads each project from the first conversation to completion, giving continuity at every stage.
Every enquiry is answered by a director within one working day, and progress is reported at every stage.
Advice follows the evidence, including where it departs from the initial brief.
Design is resolved in detail before it reaches site, so that the quality of the idea is carried into the built work.
Services that usually sit alongside this appointment. Fixed fees, staged, with a director leading the work.
Provide the site address and a summary of the requirement. A director will respond within one working day.