Crack inspection and structural reports
Diagnosis of visible cracking: its cause, its severity and the action it requires.
Diagnosis of visible cracking: its cause, its severity and the action it requires.

The studio diagnoses visible cracking: its cause, its severity and the action it requires.
Cracks are recorded, measured and assessed in the context of the building's construction, ground conditions and history of alteration.
Many cracks are cosmetic; others indicate movement that requires monitoring or repair. The inspection establishes which.
Findings are issued as a written report with recommendations.
Fees are fixed for each stage and confirmed in writing once the scope is agreed. Construction cost depends on the site, the specification and the procurement route, and is established through an indicative cost plan at feasibility stage.
Fees are fixed at each stage and confirmed in writing, so that cost is known before design begins.
A director leads each project from the first conversation to completion, giving continuity at every stage.
Every enquiry is answered by a director within one working day, and progress is reported at every stage.
Advice follows the evidence, including where it departs from the initial brief.
Design is resolved in detail before it reaches site, so that the quality of the idea is carried into the built work.
Services that usually sit alongside this appointment. Fixed fees, staged, with a director leading the work.
Provide the site address and a summary of the requirement. A director will respond within one working day.